2000 SE Slow Street Fun Build
#22
This would be my 3rd turbo car... and 4th turbo setup. Soooo yea like Curly said, I know the dangers.
Here is the gist:
December - Preparations Part 1:
949 Endlinks x
Full Polyurethane Bushings x
FM Sways x
FM Happy Meal x
Alt + Acc Belt x
Water Pump x
Timing Belt x
Shifter Boots x
Megan Racing Coil-Overs x
440cc Injectors
Clean Clean Clean
Summer 12':
Pick up hott dudez in miata
Fall 2012 - Preparations Part 2:
Parallel MS
Winter 2012/13 - Go Time:
FM Turbo Kit
3" Exhaust
Coolant Reroute
Roll Bar
Here is the gist:
December - Preparations Part 1:
949 Endlinks x
Full Polyurethane Bushings x
FM Sways x
FM Happy Meal x
Alt + Acc Belt x
Water Pump x
Timing Belt x
Shifter Boots x
Megan Racing Coil-Overs x
440cc Injectors
Clean Clean Clean
Summer 12':
Pick up hott dudez in miata
Fall 2012 - Preparations Part 2:
Parallel MS
Winter 2012/13 - Go Time:
FM Turbo Kit
3" Exhaust
Coolant Reroute
Roll Bar
Last edited by FRT_Fun; 02-20-2012 at 09:27 AM.
#24
#25
This was purchased:
December - Preparations Part 1:
949 Endlinks
Full Polyurethane Bushings
FM Sways
FM Happy Meal
Alt + Acc Belt
Water Pump
Timing Belt
Shifter Boots
Megan Racing Coil-Overs
440cc Injectors
949 Endlinks
Full Polyurethane Bushings
FM Sways
FM Happy Meal
Alt + Acc Belt
Water Pump
Timing Belt
Shifter Boots
Megan Racing Coil-Overs
440cc Injectors
#26
Worked on the car for about 4 hours today... and made some progress.
Really only planned to get the engine and front subframe pulled, but managed to get in some disassemble a it as well. Cleaned the subframe as well. There actually was not much rust on the subframe at all. After it was cleaned only a few spots will need to be touched up.
The control arms will need to be cleaned, some parts sanded, and completely painted once the bushings are pressed out.
Only had 3 bolts break. 2 ten mil bolts for the ABS wiring and the lower steering knuckle bolt. That one should be easy enough to drill out.
Tomorrow I'm going to pull the rear subframe. From there I have my work cut out for me doing the prep work for installing all the new parts.
Really only planned to get the engine and front subframe pulled, but managed to get in some disassemble a it as well. Cleaned the subframe as well. There actually was not much rust on the subframe at all. After it was cleaned only a few spots will need to be touched up.
The control arms will need to be cleaned, some parts sanded, and completely painted once the bushings are pressed out.
Only had 3 bolts break. 2 ten mil bolts for the ABS wiring and the lower steering knuckle bolt. That one should be easy enough to drill out.
Tomorrow I'm going to pull the rear subframe. From there I have my work cut out for me doing the prep work for installing all the new parts.
Last edited by FRT_Fun; 12-17-2011 at 06:46 PM.
#30
I just like to know everything about my cars. No surprises. I will have touched (oh lala) every part of this car by the time it's back on the road. Which, judging by having 4 day weekends the next two weeks, should be before January. I also feel better replacing all these rusty bolts. Can't wait for my BOX O' FM PARTS to come on Thursday. Christmas come early